Underground Storage Tank
New Placement
Requirements for Applying for a Permit:
- Completed UST New Placement Application (PDF)
- Detailed Scaled Site Plan
- Site Plan Requirements Checklist (PDF)
- Must be on 11" x 17" paper
- Scale must be 1" x 20' minimum and 1" x 200' maximum
- Construction Plans- (2 sets, unless in FD3 in which 3 sets are required)
- 11" x 17" or larger drawings (preferably scaled at 1/4" per 1')
- Structural Calculations stamped by Washington State Licensed Engineer and/or Architect (if applicable) - (2 sets, unless in FD3 in which 3 sets are required
- Equipment Cutsheets (2 sets)
- Building Code Summary (if applicable)
- Deferred Submittal Form (if applicable)
- Special Inspection Form (if applicable)
- Proof of Ownership (if applicable)
Additional Requirements to Obtain a Permit:
- Proof of Potable Water
- Current Septic System (if applicable)
- Proof of sewer connection (if applicable)
- 911 Address
- Road Approach Permit (if applicable)
- Drainage Plan
- If your site is near a water body or other critical area, special conditions may apply.
- Electrical permits are required and issued by the Washington State Department of Labor and Industries.
- When property is jointly owned or owned by others, letters from all owners must be submitted indicating project approval.
- If your lot has more than one road frontage, you must select a front yard for zoning setback purposes.
- Any parcel located in the Dungeness Water Rule area may require mitigation for use of a well.
Removal / Decommission
Requirements for Applying for a Permit:
- Completed UST Removal / Decommission Application (PDF)
- Detailed Scaled Site Plan
- Site Plan Requirements Checklist (PDF)
- Must be on 11" x 17" paper
- Scale must be 1" x 20' minimum and 1" x 200' maximum
- Proof of Ownership (if applicable)
Additional Requirements to Obtain a Permit:
- If your site is near a water body or other critical area, special conditions may apply.
- When property is jointly owned or owned by others, letters from all owners must be submitted indicating project approval.