Requirements for Applying for a Permit (when applicable): 

  • Detailed Scaled Site Plan 
    • Site Plan Requirements Checklist (PDF)
    • Scale must be 1" x 20' minimum and 1" x 200' maximum 
    • Required for Miscellaneous Mechanical, Propane (if a tank is being installed, moved, or replaced), and Solar permit applications
  • Detailed Floor Plan
    • Must show locations of mechanical system(s) 
  • Manufacturer's Product Specifications
  • Proof of Ownership

Possible Additional Requirements to Obtain a Permit: 

  • If your site is near a water body or other critical area, special conditions may apply.
  • Electrical permits may be required and are issued by the Washington State Department of Labor and Industries.
  • When property is jointly owned or owned by others, letters from all owners must be submitted indicating project approval.