Miscellaneous

Requirements for Obtaining a Demolition Permit:

  • Site plan including property lines, existing structures, structures to be demolished, and location of septic components (if applicable)
  • Copy of receipt from ORCAA Demolition Permit
    • For more information, please visit the ORCAA website
  • Copy of asbestos report
  • Completed Demolition Permit Application (PDF)
  • Additional Notes:
    • There is a 14-day waiting period from the date of payment to ORCAA to when your Demolition Permit can be issued
    • If your site is near a water body or other critical area, special conditions may apply
    • When property is jointly owned or owned by others, letters from all owners must be submitted indicating project approval

Requirements for Applying for a Miscellaneous Building Permit: 

Additional Requirements to Obtain a Permit (if applicable): 

  • Proof of Potable Water
  • Current Septic System 
  • Proof of sewer connection 
  • 911 Address
  • Road Approach Permit 
  • Drainage Plan
  • If your site is near a water body or other critical area, special conditions may apply.
  • Electrical permits are required and issued by the Washington State Department of Labor and Industries.
  • When property is jointly owned or owned by others, letters from all owners must be submitted indicating project approval.
  • If your lot has more than one road frontage, you must select a front yard for zoning setback purposes.
  • Any parcel located in the Dungeness Water Rule area may require mitigation for use of a well.