Commercial

Permit Portal

New Construction / Additions / Alterations

Requirements for Applying for a Permit (when applicable): 

  • Detailed Scaled Site Plan 
  • Structural Drawings 
    • Foundation, Floor, Framing, and Roof Framing Plans
    • Prescriptive braced wall line locations and calculations for both seismic and wind loads (site specific)
    • Elevations - all four directions
    • Structural Cross Sections and Details
    • Truss Design
  • Structural Calculations stamped by Washington State Licensed Engineer and/or Architect 
  • Washington State Energy Calculations
  • Building Code Summary
  • Means of Egress / Emergency Lighting Floor Plan 
  • Deferred Submittal Form
  • Special Inspection Form
  • Proof of Ownership

Possible Additional Requirements to Obtain a Permit:

  • Proof of Potable Water
  • Current Septic System
  • Proof of sewer connection
  • 911 Address
  • Road Approach Permit
  • Drainage Plan
  • If your site is near a water body or other critical area, special conditions may apply.
  • Electrical permits are required and issued by the Washington State Department of Labor and Industries.
  • When property is jointly owned or owned by others, letters from all owners must be submitted indicating project approval.
  • If your lot has more than one road frontage, you must select a front yard for zoning setback purposes.
  • Any parcel located in the Dungeness Water Rule area may require mitigation for use of a well.

Wireless Communication Facilities 

Requirements for Applying for a Permit (when applicable): 

  • Detailed Scaled Site Plan 
  • Structural Drawings 
    • Equipment Building (if changes are being done to an existing building, if a new building is being added, or a building is being replaced)
    • Tower and attachments
    • Elevations - all four directions
    • Structural Cross Sections and Details
  • Structural Calculations stamped by Washington State Licensed Engineer and/or Architect
  • Mount Analysis Report 
  • Special Inspection Form
  • Proof of Ownership

Possible Additional Requirements to Obtain a Permit: 

  • 911 Address
  • Road Approach Permi
  • Drainage Plan
  • If your site is near a water body or other critical area, special conditions may apply.
  • Electrical permits, when required, are issued by the Washington State Department of Labor and Industries.
  • When property is jointly owned or owned by others, letters from all owners must be submitted indicating project approval.